Ship-Loader
Fabrication, Assembly, Test and Commissioning.
Installation, test and commissioning of electrical and instrumentation systems were completed by Deha Tech
Location
TURKEY
Service
EPC
Date
2021
Duration
14 Months
Scoope Of Work
Remote I/O Panel
12 Set
MV/LV Transformer
8 Sett
Lighting Fixture
736 pcs
Local Box, Junction Box
324 pcs
MCC Panel
8 Sett
Instrument
580 pcs
Cable Tray
4.036 m.
LV-MV-instrumentation Cable
96.060 m.